| Complete packages designed for your particular
applications or just supply commodity for in-plant
use. Custom engineering, monitoring and/or
maintenance to your system-specific needs.
APPLICATION: Check spray orifices and clean
pans to assure maximum coverage. Thoroughly flush
entire system to remove all loose deposits and
refill with the minimum amount of clean water to
maintain pump circulation. Turn off make-up and
bleed-off valves. Slowly add recommended quantity
of Delta Descalers for tower cooling
capacity and circulate until all foaming action
stops. Drain and flush system directly to sewer
and refill tower, or bleed-off and overflow all
dissolved solids to drain over several days until
clear. |